This Local Authority (Trafford Borough Council) school, built in 1921, offered another project which had to be completed within a tight schedule to fit in with term time. Work involved stabilising the site after collapse of internal cloakroom walls due to the failure of the existing floor slab.

The supervising Structural Engineer on this occasion was Kevan Minors, who commented:

‘This was a tricky project which needed to be completed within a tight schedule. The site investigation proved that a ‘wash-out’ had taken place, creating a floor area void of about 115mm, and causing settlement of some 85mm over 3 metres. Doors were jamming and there was damage to internal walls. Anvil provided all the necessary information quickly and completed the work on time, including putting in a new floor and allowing the caretakers time to prepare the area before the new term’.

We must have done something right, because we subsequently received a congratulatory phone call from the Headmaster thanking us for completing the work on time!

 

Who's Online:

We have 583 guests online

 

Minipiling Manchester | Minipiling Lancashire | Piling In Lancashire | Piling In Northwest | Piling Lancashire | Piling Northwest | Piling In Manchester
Piling Manchester | Piling In Cheshire | Underpinning In Cheshire | Grouting In Cheshire | Minipiling In Cheshire

Anvil Foundations Ltd provides Piling, Minipiling, Underpinning and Grouting services throughout Manchester, Lancashire And The Northwest.

Anvil Foundations © | 5300 Lakeside, Cheadle Royal Business Park, Cheadle, Cheshire, SK8 3GP | Company Registration Number: 2960730
Registered Office: Hillgate Place, 77 Middle Hillgate, Stockport, Cheshire SK1 3EH | Underpinning Manchester | Grouting | 0161 246 6055 | 07701 386 428 Website Design By Bolton Web Design